This was a mine site where clay was extracted for the use of brick manufacturing. Once mining activity was complete, ARstate hydromulched the 6 acre area on a 4:1 slope in 2 days. The site was challenging due to the steep slope. High quality material was used at above-average rates to ensure the hillside would stay in place and produce a good stand of grass.